Skip to content

Rooftop Solar Panel Installation in Jabalpur, Madhya Pradesh

SolarEnergy

Green Arrow Solar designs and installs rooftop solar for homes, businesses and farms across Jabalpur & Madhya Pradesh — subsidy and net-metering handled for you.

300+

Sunny days a year in MP

Solar technician in a safety helmet

₹78K

Max subsidy under PM Surya Ghar

Rows of blue solar panels
Installer inspecting a rooftop solar plant
Ground-mounted solar array on grass
Solar panels on a home rooftop

Subsidy Ready

Cut Your Bill With Rooftop Solar

Technician checking generation on a tablet

Solar For Homes, Farms & Business

On-grid, hybrid and solar pump systems — sized honestly and fitted by our own trained crew.

PM Surya Ghar subsidy support✦Net metering handled for you✦Free site survey✦Up to 25-year panel performance warranty✦Local Jabalpur service team✦ALMM-listed, subsidy-eligible panels✦

What we do

Rooftop solar for every home, farm and business in Jabalpur

From a 1 kW home system to a factory rooftop plant, designed and installed by one accountable local team.

Residential Rooftop Solar

Cut your home electricity bill sharply with a subsidy-eligible rooftop system sized to your usage.

  • ✓On-grid systems from 1 kW to 10 kW
  • ✓PM Surya Ghar subsidy paperwork handled
  • ✓Net-metering application with your DISCOM
  • ✓Generation monitoring app included

Commercial & Industrial

Shops, schools, hospitals and factories — lower running costs and a faster payback.

  • ✓Load study and ROI report
  • ✓Accelerated depreciation guidance
  • ✓Structures for RCC and shed roofs
  • ✓Annual maintenance contracts

Solar Water Pumps

Daytime irrigation without diesel or grid dependence for farms across MP.

  • ✓Pumps from 1 HP to 10 HP
  • ✓PM-KUSUM scheme guidance
  • ✓Works in remote, off-grid fields
  • ✓Low maintenance, zero fuel cost

Off-Grid & Hybrid + Battery

Power that keeps running through cuts — batteries and hybrid inverters done right.

  • ✓Lithium and tubular battery options
  • ✓Hybrid inverter configuration
  • ✓Backup for homes, clinics, shops
  • ✓Right-sized, never over-sold

Why go solar in MP

The numbers speak for themselves

Maximum central subsidy for eligible homes
₹78,000

Maximum central subsidy for eligible homes

Possible reduction in your electricity bill
90%

Possible reduction in your electricity bill

Panel performance warranty (typical)
25 yrs

Panel performance warranty (typical)

Of sunshine a year in Jabalpur
~3,500 hrs

Of sunshine a year in Jabalpur

How it works

From first call to free power in five steps

    1

    Free site survey

    We visit, measure shade, roof area and your electricity load. No charge, no pressure.

    2

    Honest design & quote

    A right-sized system with a transparent breakup, expected generation and payback.

    3

    Subsidy & net-metering paperwork

    We handle portal registration, the DISCOM application and documentation.

    4

    Professional installation

    A trained crew, quality structure and cabling, tested before handover. Most home systems are fitted within a few days once approvals are in.

    5

    Monitor & maintain

    Track generation on your phone. We are one call away for cleaning and service.

Savings calculator

Solar subsidy & savings calculator for MP

Move the slider to match your bill. See your system size, PM Surya Ghar subsidy, payback and EMI.

Property type

₹5,000

₹500₹15,000

Auto — ₹12.5/unit. Know yours? Bill amount ÷ units on your bill.

Estimated savings over 30 years

₹18,00,000

EMI about ₹1,451/month for 10 years, after ₹12,200 down payment

Recommended system

3 kW

Govt. subsidy

₹78,000

Monthly saving

₹5,000

Payback (ROI)

24 months (2.0 yrs)

Roof space needed

150 sq ft

CO₂ saved / yr

3,907 kg

Equal to planting

186 trees

Yearly saving

₹60,000

Down payment (10%)

₹12,200

System cost

₹2,00,000

Subsidy

– ₹78,000

You pay

₹1,22,000

Estimates only. A 3 kW system generates about 400 units a month and costs ₹2,00,000, or ₹1,22,000 after the ₹78,000 PM Surya Ghar subsidy, so it pays for itself in about 2.0 years. Needs 50 sq ft of shadow-free roof per kW. Your exact quote comes after a free site survey.

Get an exact quote

Meet our founders

Two solar veterans, one Jabalpur mission

Together, they are on a mission to make Jabalpur a solar-powered city.

Nitin Thakre

Nitin Thakre

Co-Founder · Green Energy Solutions Pvt. Ltd., Nagpur

Nitin brings the experience of Green Energy Solutions Pvt. Ltd., Nagpur, which delivers rooftop, hybrid, off-grid and solar water-heater systems for homes, schools, hospitals, farms and businesses, including projects at Tadoba Resort and Gondwana Resort.

Vishal Korde

Vishal Korde

Co-Founder · Solar Trees (India)

Vishal brings the product and solutions expertise of Solar Trees, with a commitment to making solar energy simple and affordable for every household — now extended to Jabalpur and Madhya Pradesh.

Service areas

Solar across Jabalpur & Madhya Pradesh

Based in Jabalpur, serving homes, businesses and farms across the state.

FAQ

Solar questions from Jabalpur homeowners

Under the central PM Surya Ghar: Muft Bijli Yojana, eligible households receive ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000. Rules can change, so we confirm current scheme terms during your survey.

Jabalpur receives approximately 3,500 hours of sunshine a year. A 1 kW solar system generates 4 to 4.5 units (kWh) of electricity per day, about 120–135 units a month. Actual output depends on shade, tilt and cleaning.

Match the system to your monthly electricity bill: up to ₹2,000 → 1–2 kW; ₹2,000–₹3,500 → 2–3 kW; ₹3,500–₹5,000 → 3–4 kW; ₹5,000+ → 5 kW or more. Use our savings calculator for an indicative size, and our free site survey will confirm the exact size you need.

Net metering lets you send excess solar electricity back to the grid. Your meter records the power you export, and you get credit for it on your electricity bill. In Jabalpur, MPPKVVCL handles net-metering applications, and Green Arrow Solar assists with the complete process.

Solar panels generate electricity even on cloudy days, though at reduced capacity (about 25–40% of peak output). During power cuts, on-grid systems shut down for safety (anti-islanding). If you want power during outages, choose a hybrid solar system with battery backup.

Quality solar panels last 25–30 years, with a performance warranty that typically guarantees at least 80% output at year 25. Inverters usually last 10–15 years. Panels need minimal maintenance: mainly periodic cleaning and an annual check of the inverter and connections.

Ready to switch to solar?

Book a free site survey. We will size the system honestly and handle the subsidy paperwork.